INVESTMENT IN FACTORY LOTTER 3 – FACTORY 9 TO 19

  • Investor: Giang Dien Sonadezi Joint Stock Company
  • Location: Giang Dien Industrial Park, Dong Nai Province
  • Size: 138.170m2
  • Total construction area: 68,735m2
  • Number of floors: 1
  • Service:
    • Design plan
    • Basic design
    • Construction Design
    • Make an estimate
  • Year of design: 2019-2020